Open Compute ProjectDIW 2027 OCP Tech Day
February 3–4, 2027 · San Jose

Digital Infrastructure World 2027: The AI data center event

IT and data centers, designed as one

In collaboration with the Open Compute Project

Advance rate ends Oct. 30: $699 now, $799 after
DIW Silicon Valley · February 3–4, 2027

The #1 event forIT and data center convergence

Designed as one. Deployed as one. Delivered as one.

2.5K
Attendees
500
Companies
150
Speakers
100
Sponsors
50+
Journalists & media

DIW is a collaboration between the leading communities at every layer of the AI stack.

Digital Infrastructure World
Data Centre World event
Data Centre World

Data Centre World

The largest data centre event in the world

48KVisitors, all editions
1.9KSponsors, all editions
Open Compute Project event
Open Compute Project

Open Compute Project

Community-driven hyperscale innovation for all

15KAt Global Summit
650+Members
Ai4 Las Vegas event
Ai4

Ai4 Las Vegas

America's largest AI event

20KAttendees
600Exhibitors

Two days, four tracks, full stack

Agenda at a glance

Two days, four tracks, full stack

Mainstage · 8 sessions

Keynotes

Open Systems for AI
OCP Tech Day

Rack

Designing the 1MW Rack

Open Compute Project20 sessions
OCP Rack - Track Keynote
  1. Open Racks
  2. Silicon Diversity
  3. AI-Native Servers
  4. Scale-Up Interconnect
  5. In-Rack Cooling
  6. In-Rack Power
About this track
About this track

Rack is OCP's Tech Day programming on the rack as the unit of AI compute.

What you walk away with

OCP Tech Day: to be announced

Who it's for
OCP Tech Day: to be announced
Track

Cluster

Architecting 1M GPU Clusters

15 sessions
OCP Cluster - Track Keynote
  1. Training & Reliability
  2. Agentic Inference
  3. Scale-Out & Across
  4. Hyperscale-adjacent Clusters
  5. Test & Validation
  6. Token Economics
About this track
About this track

Cluster is about turning racks into one machine.

What you walk away with
  • Building scale-out fabrics on 51.2T switches
  • Moving from 800G to 1.6T optics, and what changes
  • Keeping 100K+ GPU jobs above 90% goodput
Who it's for
VP, AI InfrastructureDirector, ML PlatformPrincipal Network ArchitectHead of GPU Cloud Engineering
Track

Data Center

Building 1GW AI Data Centers

20 sessions
OCP Data Center - Track Keynote
  1. Modular & Prefab
  2. Cooling & Thermal
  3. 800V & Solid-State Power
  4. Enabling 1MW Racks
  5. Brownfield to AI
  6. IT/OT Convergence
About this track
About this track

Data Center is about building the AI factory around the rack.

What you walk away with
  • Landing 130kW+ liquid-cooled racks in an air-cooled hall
  • What 35-45°C facility water buys you
  • What 800 VDC and medium voltage change in the building
Who it's for
VP, Data Center EngineeringDirector, Critical FacilitiesHead of Data Center DesignMEP Engineering Lead
Track

Energy

Developing 10GW Pipelines

15 sessions
OCP Energy - Track Keynote
  1. Flexible Grid Load
  2. Space Data Centers
  3. Generation & Storage
  4. Speed to Power
  5. Water & Community
  6. Capital & Development
About this track
About this track

Energy is about time to power, and working with the grid once you're on it.

What you walk away with
  • Getting 500MW+ through the interconnection queue
  • When behind-the-meter power beats a 5-7 year grid wait
  • Recips, turbines, fuel cells or batteries: what gets you power in 18-24 months
Who it's for
VP, Energy and Power StrategyHead of Site SelectionDirector, Utility PartnershipsPower Systems Engineer
Advance rate ends Oct. 30: $699 now, $799 after

DIW: Specially invited companies

Hyperscale / AI labs
Google
Microsoft
Meta
AWS
Oracle
Anthropic
OpenAI
xAI
Apple
ByteDance
Neocloud Giants
CoreWeave
Crusoe
IREN / Iris Energy
Fluidstack
Lambda
Nebius
NScale
Together AI
Firmus
Vultr
Colocation and BTS
Vantage
QTS
Aligned
Compass
Equinix
Digital Realty
NTT
CyrusOne
Switch
Core Scientific
Elite Enterprises
Netflix
Uber
Jane Street
eBay
JPMorgan
XTX Markets
Tesla
Salesforce
ServiceNow
Verizon
AEC players
Corgan
Jacobs
HDR
Burns & McDonnell
AECOM
Black & Veatch
DPR Construction
Gensler
Syska Hennessy
Arup
IT Equipment OEMs
Supermicro
Arista
Dell
HPE
IBM
Cisco
Lenovo
Nokia
NetApp
Ciena
DC Facility OEMs
Schneider Electric
Vertiv
Siemens
Eaton
Johnson Controls
GE Vernova
Delta
Legrand
Rittal
CoolIT
Silicon providers
NVIDIA
AMD
Broadcom
Intel
Arm
Marvell
Micron
Samsung
Qualcomm
SK hynix
Yancy Weinrich
The sector has reached a clear inflection point. The traditional separation of IT and data centers no longer works for AI, so we built one room where the rack and the building are finally designed together.
Yancy Weinrich
U.S. President, CloserStill Media (CSM DCW and Ai4)
George Tchaparian
Digital Infrastructure World creates a dynamic, hands-on environment for the OCP Community to share the specific challenges of scaling high-performance and AI-accelerated compute within the physical facility.
George Tchaparian
CEO, Open Compute Project Foundation

Our sponsors

DIW sponsors
Ecolab | CoolIT Systems
Phoenix Contact
Munters
Vultr
ifm
Ecolab | CoolIT Systems
Phoenix Contact
Munters
Vultr
ifm
Ecolab | CoolIT Systems
Phoenix Contact
Munters
Vultr
ifm
Ecolab | CoolIT Systems
Phoenix Contact
Munters
Vultr
ifm
Ecolab | CoolIT Systems
Phoenix Contact
Munters
Vultr
ifm
Ecolab | CoolIT Systems
Phoenix Contact
Munters
Vultr
ifm
DriveNets
Redwood Software
Supmea
HYDRA Host
DriveNets
Redwood Software
Supmea
HYDRA Host
DriveNets
Redwood Software
Supmea
HYDRA Host
DriveNets
Redwood Software
Supmea
HYDRA Host
DriveNets
Redwood Software
Supmea
HYDRA Host
DriveNets
Redwood Software
Supmea
HYDRA Host
EPEC Solutions
Baxtel
D Volt Co.
The Velocity Room
EPEC Solutions
Baxtel
D Volt Co.
The Velocity Room
EPEC Solutions
Baxtel
D Volt Co.
The Velocity Room
EPEC Solutions
Baxtel
D Volt Co.
The Velocity Room
EPEC Solutions
Baxtel
D Volt Co.
The Velocity Room
EPEC Solutions
Baxtel
D Volt Co.
The Velocity Room
DCA sponsors
Emerson
LS Electric
LiquidStack
AFL
Anord Mardix
MP, powered by APi Group
Target Hospitality
Roxtec
Emerson
LS Electric
LiquidStack
AFL
Anord Mardix
MP, powered by APi Group
Target Hospitality
Roxtec
Emerson
LS Electric
LiquidStack
AFL
Anord Mardix
MP, powered by APi Group
Target Hospitality
Roxtec
Emerson
LS Electric
LiquidStack
AFL
Anord Mardix
MP, powered by APi Group
Target Hospitality
Roxtec
Airsys
Sieyuan Electric
LU-VE
Walther-Werke
ONICON
Maddox
Meltric
HiRef
Airsys
Sieyuan Electric
LU-VE
Walther-Werke
ONICON
Maddox
Meltric
HiRef
Airsys
Sieyuan Electric
LU-VE
Walther-Werke
ONICON
Maddox
Meltric
HiRef
Airsys
Sieyuan Electric
LU-VE
Walther-Werke
ONICON
Maddox
Meltric
HiRef
Multilink
TT Cables
Forbo Flooring Systems
Eastron Europe
Trasf Eco
PHS West
Reçber
Tesar
Multilink
TT Cables
Forbo Flooring Systems
Eastron Europe
Trasf Eco
PHS West
Reçber
Tesar
Multilink
TT Cables
Forbo Flooring Systems
Eastron Europe
Trasf Eco
PHS West
Reçber
Tesar
Multilink
TT Cables
Forbo Flooring Systems
Eastron Europe
Trasf Eco
PHS West
Reçber
Tesar
Pinnacle partners
Open Compute Project
Uptime Institute
Nomad Futurist Foundation
Michael Tobin
Data Center Results
Technology Reseller News
Open Compute Project
Uptime Institute
Nomad Futurist Foundation
Michael Tobin
Data Center Results
Technology Reseller News
Open Compute Project
Uptime Institute
Nomad Futurist Foundation
Michael Tobin
Data Center Results
Technology Reseller News
Open Compute Project
Uptime Institute
Nomad Futurist Foundation
Michael Tobin
Data Center Results
Technology Reseller News
Open Compute Project
Uptime Institute
Nomad Futurist Foundation
Michael Tobin
Data Center Results
Technology Reseller News
Open Compute Project
Uptime Institute
Nomad Futurist Foundation
Michael Tobin
Data Center Results
Technology Reseller News
Event partners
Oracle
Siemens
DPR Construction
QuantumScape
Rehlko
Provident Data Centers
Airsys
Oracle
Siemens
DPR Construction
QuantumScape
Rehlko
Provident Data Centers
Airsys
Oracle
Siemens
DPR Construction
QuantumScape
Rehlko
Provident Data Centers
Airsys
Oracle
Siemens
DPR Construction
QuantumScape
Rehlko
Provident Data Centers
Airsys
Oracle
Siemens
DPR Construction
QuantumScape
Rehlko
Provident Data Centers
Airsys
Oracle
Siemens
DPR Construction
QuantumScape
Rehlko
Provident Data Centers
Airsys
DartPoints
Camus Energy
NeuReality
DIMAAG
7 Elm Strategies
Dynamix
Tensordyne
DartPoints
Camus Energy
NeuReality
DIMAAG
7 Elm Strategies
Dynamix
Tensordyne
DartPoints
Camus Energy
NeuReality
DIMAAG
7 Elm Strategies
Dynamix
Tensordyne
DartPoints
Camus Energy
NeuReality
DIMAAG
7 Elm Strategies
Dynamix
Tensordyne
DartPoints
Camus Energy
NeuReality
DIMAAG
7 Elm Strategies
Dynamix
Tensordyne
DartPoints
Camus Energy
NeuReality
DIMAAG
7 Elm Strategies
Dynamix
Tensordyne

Highlights to expect: designed as one

Watch on YouTube

All roads lead to Silicon Valley.

San Jose McEnery Convention Center · February 3-4, 2027 ·

ADVANCE RATE
OCP Member

For Open Compute Project members

$349.50
per person · Rises to $399 after Oct. 30
Register now
  • Everything in All Access
  • Half the All Access price
Most popular
ADVANCE RATE
All Access

For teams who build, buy or run AI infrastructure

$699
per person · Rises to $799 after Oct. 30
Register now
  • Both days: keynotes, all four tracks and OCP Tech Day
  • Exhibit hall
  • Networking receptions and 1:1 meetings
  • Lunch and coffee breaks
  • Event app
ONE RATE
Sales & Marketing

For suppliers who are not exhibiting

$3,450
per person
Register now
  • Everything in All Access
  • Exhibitors get passes with their package

Coming as a team of 3 or more? Each pass is 25% off: All Access at $524.25 each.