Tracks

Four tracks, rack to grid

Systems-level thinking, across the tracks.

Rack is OCP's Tech Day programming on the rack as the unit of AI compute. Open racks heading to 1MW, more than one accelerator in the same fleet, scale-up networking, liquid cooling and 800 VDC power, from the hyperscaler and silicon engineers who write the open specs.

Programmed byOpen Compute Project
Who it's for
VP, Hardware EngineeringPrincipal Hardware EngineerDirector, Rack and Platform ArchitectureServer Design LeadHead of Silicon StrategyODM Program Manager
What you walk away with
  • Where Open Rack Wide and racks of up to 1MW are heading
  • Running more than one accelerator in the same fleet
  • What cold plate can handle above 200kW, and when two-phase comes in
  • How 800 VDC gets from the sidecar to the tray
Who's speaking
OCPAnnounced soonOCP Tech Day speaker
OCPAnnounced soonOCP Tech Day speaker
+Your name hereSpeak on this track

Programmed and hosted by the Open Compute Project. No sponsored sessions.

Apply to speak
Topics on the agenda

Rack: OCP Tech Day topics

The Rack track is OCP Tech Day, programmed by the Open Compute Project, on designing the 1MW rack: open racks, silicon diversity, AI-native servers, in-rack scale-up interconnect, in-rack cooling and in-rack power distribution. Sessions are confirmed by OCP; these are the topics on the agenda.

Open Compute Project
01 · Open Racks

Open racks: from ORv3 to Open Rack Wide

The rack frame is now a load-bearing specification. Meta's Open Rack Wide (ORW) design is 1,200 mm wide and rated for at least 4,700 kg of payload, against 1,400 kg for an ORv3 high-power rack; the ORW base specification from Meta and Rittal reached v1.0 in April 2026.

Meta's roadmap runs from ORv3 racks with up to 72 accelerators to ORW with up to 144, then a rack above 900 kW in 2027, and AMD built its Helios rack-scale platform on ORW. Sessions cover ORW progress and validation, NVIDIA's MGX power rack reference design, and applying ORv3 and ORW design principles to Arm-based AI racks: the frame, the busbar, the liquid manifolds and the power rack that now sits beside the IT rack.

Topics include
  • Open Rack V3 (ORv3)
  • Open Rack Wide (ORW)
  • MGX power rack
  • Double-wide AI racks
  • Rack-scale AI systems
  • Rack busbars
Further reading: Open Rack Wide (ORW) Meta Design Specification v1.0.0 (OCP, 2026)
02 · Silicon Diversity

Silicon diversity: an open market for chiplets

A chiplet only becomes a market when dies from different vendors can talk to each other. OCP's Bunch of Wires (BoW) 2.0 die-to-die specification now has a memory addendum, led by Eliyan, that targets HBM4 bandwidth of 2 TB/s within less than 10 mm of die edge.

Arm contributed its Foundation Chiplet System Architecture (FCSA) to OCP in October 2025, a vendor-neutral baseline for splitting a monolithic SoC into compute, memory, I/O and accelerator chiplets. The OCP Chiplet Marketplace, launched in 2024, catalogs chiplets, design tools and services. Sessions cover the open chiplet economy, scaling compute, memory and connectivity, interoperable chiplet systems on Arm Neoverse, and a common security architecture for FCSA: the groundwork for running more than one accelerator, or your own, without a single-vendor stack.

Topics include
  • Open Chiplet Economy
  • Bunch of Wires (BoW)
  • Foundation Chiplet System Architecture (FCSA)
  • OCP Chiplet Marketplace
  • Chiplet security
  • Custom XPUs
Further reading: OCP expands Open Chiplet Economy ecosystem (OCP, 2025)
03 · AI-Native Servers

AI-native servers: modular, liquid-cooled, built around the accelerator

The server is being rebuilt around the accelerator. NVIDIA's Vera Rubin NVL72 compute tray is 100% liquid-cooled and replaces internal cables with a printed circuit board midplane, and NVIDIA plans to contribute the rack and tray designs to OCP as an open standard.

Open building blocks keep the rest of the server interchangeable. DC-MHS sets common form factors and interfaces for host processor modules, I/O and management (DC-SCM), and AMD's Helios rack uses it. OCP NIC 3.0, at v1.6 since March 2025 with a further draft in August 2026, defines the network card in four form factors (SFF, LFF, TSFF and DSFF). Sessions cover MHS modular plug-and-play tools and proof-of-concept work, the Open Adapter Card (OAC) for sub-rack-scale acceleration, and the next OCP NIC generation with liquid cooling.

Topics include
  • DC-MHS
  • DC-SCM
  • Modular plug-and-play (M-PnP)
  • OCP NIC 3.0
  • Open Adapter Card (OAC)
  • Liquid-cooled compute trays
Further reading: NVIDIA at the OCP Global Summit: Vera Rubin and gigawatt AI factories (NVIDIA, 2025)
04 · Scale-Up Interconnect

Scale-up interconnect: open Ethernet inside the rack

Scale-up, the fabric that lets accelerators in a rack share memory as one machine, is moving to open Ethernet. SUE-T, the scale-up Ethernet transport from Broadcom and Arista published at OCP in October 2026, targets under 2 microseconds round trip and up to 16K XPUs in a single hop.

ESUN (Ethernet for Scale-Up Networking) launched at the 2025 OCP Global Summit with 12 founding members, among them AMD, Broadcom, Meta, Microsoft, NVIDIA and OpenAI, and has since published its 1.0 specification. ESUN covers the network side (L2/L3 framing, switching and lossless, error-resilient transfer); SUE-T covers the XPU endpoint, and in its reference example six 1.6T instances give one XPU 9.6 Tb/s of scale-up bandwidth. Sessions cover ESUN, SUE-T and MRC, an RDMA transport built for AI training networks. Scale-out between racks belongs to the Cluster track.

Topics include
  • Scale-up networking
  • ESUN
  • SUE-T
  • Ethernet for scale-up
  • XPU interconnect
  • RDMA transport
Further reading: Scale-Up Ethernet Transport (SUE-T) Base Specification v1.0.0 (OCP, 2026)
05 · In-Rack Cooling

In-rack cooling: how far single-phase cold plate can go

Liquid is now designed into the rack, not added to the room. NVIDIA's Vera Rubin rack runs on 45°C liquid, and Rittal expects coolant flow per rack to rise from about 300 to about 2,000 liters per minute as racks head to 1 MW, through eight quick disconnects instead of two.

Flow is where single-phase cold plate runs into trouble. On a 750 kW loop, nVent and Alloy Enterprises showed that raising flow from 0.7 to 2.0 LPM per kW multiplies header pressure drop about 7x and pump power about 19x. Sessions cover where air cooling still wins for general compute, real-time monitoring of propylene glycol coolant in the technology cooling system, standardized two-phase cooling, tooling and telemetry for liquid cooling at fleet scale, and a closing panel on the runway left for single-phase cold plate before two-phase scales. CDUs and facility water belong to the Data Center track.

Topics include
  • Direct-to-chip cold plates
  • Two-phase liquid cooling
  • Technology cooling system (TCS)
  • Propylene glycol (PG25) coolant
  • Quick disconnects
  • Air vs liquid cooling
06 · In-Rack Power

In-rack power: sidecars, 800 VDC and the busbar

At 54 V, a 1 MW rack would draw about 18,500 A; at 800 V, about 1,250 A. The Mt Diablo disaggregated power rack from Google, Meta and Microsoft, published as v1.0 in October 2026, moves AC-to-DC conversion into a sidecar sized for 800 kW to 1.1 MW of IT load, with ±400 VDC or 800 VDC out.

Mt Diablo specifies 45 to 90 seconds of battery backup at full load. NVIDIA's MGX-compatible 800 VDC power rack, due in the second half of 2026, feeds 800 VDC to compute racks in an existing AC row without changes to the building's electrical system. Sessions cover aggregated and cascaded power shelf architectures, an 800 V DC sidecar design, ORv3 power for higher loads, 800 V direct-to-server power shelves, and an Open Rack busbar interface for racks of 1 MW and beyond. Power from the grid to the row belongs to the Data Center and Energy tracks.

Topics include
  • 800 VDC sidecars
  • Mt Diablo
  • ±400 VDC
  • Power shelves
  • Battery backup units (BBU)
  • Rack busbar interfaces
Further reading: Mt. Diablo Disaggregated Power Rack Specification v1.0.0 (OCP, 2026)
Questions this track answers
  • Which rack designs will still work as power per rack heads toward 1 MW?
  • Can we buy accelerators from more than one supplier and run them side by side?
  • When does air cooling stop being enough, and what replaces it?
  • How does power get into the rack safely at higher voltages, and who makes the parts?
In scope
  • Open Rack V3 and Open Rack Wide
  • 800 VDC and ±400 VDC sidecars
  • Power shelves and rack busbars
  • Single-phase and two-phase cold plates
  • Scale-up fabrics (ESUN, SUE-T)
  • Chiplets and custom silicon
  • Modular servers (DC-MHS) and OCP NICs
  • Battery backup inside the rack
Covered in another track
  • Scale-out and scale-across networks → belongs in Cluster track
  • CDUs and facility water → belongs in Data Center track
  • Facility power and solid-state transformers → belongs in Data Center track
  • Grid connection and on-site generation → belongs in Energy track